Categories
Search


Advanced Search
 »  Home  »  Diagnostics, Prognostics and Testability  »  IVHM / IPHM  »  IVHM Design Using eXpress  »  Develop, Assess, Optimize, Repeat
IVHM Design Using eXpress
by DSI Staff | Published  6/28/2004 | IVHM / IPHM
Develop, Assess, Optimize, Repeat
Full optimization of IVHM takes lots of iterations. Each iteration should converge on a solution. It is beyond the scope of this article (see related stories, below, for more information) to discuss trade-studies, but it is this aspect of performing trade studies in a large-scale system design that is essential to IVHM development.

So what are the keys to assessing IVHM in eXpress?

Once some of the basic topology of a design is known, eXpress can be used to provide these statistics:

  • Fault Detection and Isolation
  • Test Point Utilization and Recommendation
  • Fault Group Size and Expected False Removal Statistics

As one progresses, there are more complex statistics that are used to factor in modes of operation, including degraded modes of operation:

  • Subset FD/FI Report
  • Scope-limited Diagnostic Assessment
  • FMECA report, including Detection Method

With these assessments, the next challenge becomes how to use them in such a way to influence decision making at the early point in system development as to make a difference. This is done automatically in eXpress, through its use of data layering.

Comments
Article Options
Popular Articles
  1. Early Functional Analysis and Allocation in the System Engineering Process
  2. Trade Studies, Risk Management, Simulation, Oh My!
  3. From Diagnostics to Prognostics with eXpress
  4. Diagnostic Optimization of Large-Scale Systems
  5. IVHM Design Using eXpress
Popular Authors
  1. DSI Staff
  2. DSI Admin